Muglin-Narayangadh Road Section has reopened for two-way traffic after being blocked by landslides in various places.
The road section was blocked at Tuin Khola, Kerabari, and Jalebire due to landslides. However, after clearing the blockages, the road has become operational.
According to the Road Division Office in Bharatpur, the road was cleared using machinery from early morning, allowing two-way traffic to resume.
The District Administration Office in Chitwan had previously halted traffic on Monday evening due to increased risk after landslides occurred in various places.
Although the road has reopened, the evening closure has resulted in an increased rush of vehicles.
Replies
No replies yet. Log in to be the first to reply!